Skill 详情
construction-docs
Creates construction documentation packages, commissioning checklists, and O&M manuals.
使用前先检查
自动化审核只检查相关性,不代表安全审查或推荐。使用前请阅读来源中的说明。
SKILL.md
这段内容是审核时保存的快照。外部来源才是完整且最新的版本。
---
name: construction-docs
version: 1.0.0
description: "Generates complete construction documentation packages — BOM, installation sequences, commissioning checklists, and O&M manuals — from verified engineering designs."
user-invocable: true
allowed-tools: Read Grep Glob Bash
metadata:
extensions:
gsd-skill-creator:
version: 1
createdAt: "2026-02-27"
triggers:
intents:
- "bill of materials"
- "BOM"
- "installation sequence"
- "commissioning"
- "pre-commissioning"
- "O&M manual"
- "operations and maintenance"
- "construction documents"
- "hydrostatic test"
- "megger test"
- "insulation resistance"
- "punch list"
- "startup procedure"
- "spare parts"
- "maintenance schedule"
contexts:
- "construction documentation"
- "infrastructure engineering"
- "commissioning procedures"
- "data center construction"
domain: physical-infrastructure
tier: output
depends_on:
- fluid-systems
- power-systems
- thermal-engineering
- blueprint-engine
safety: mandatory-pe-disclaimer
applies_to:
- skills/physical-infrastructure/**
- "*.calc"
- "*.pid"
- "*.sld"
---
# Construction Documents Skill
## At a Glance
Generate the complete paper package that contractors need to build a system — Bill of Materials, installation sequences, commissioning tests, and Operations & Maintenance manuals — from verified engineering designs.
**Activation:** After the Architect, Calculator, and Safety agents complete a design and the blueprint engine has generated drawings. InfrastructureRequest with outputFormat including 'construction'.
**Four output types:**
1. **Bill of Materials (BOM):** Structured material list with quantities, part numbers, and suppliers extracted from verified design calculations.
2. **Installation Sequence:** Code-driven ordering of construction activities with trade assignments, prerequisites, and inspection hold points.
3. **Commissioning Checklists:** Pre-commissioning test procedures (hydrostatic, megger) and system startup procedures with acceptance criteria.
4. **O&M Manual:** Maintenance schedules, spare parts lists, operating procedures, and emergency procedures for the completed system.
**When to use:** Design is verified and safety-reviewed, ready for construction. All calculations must pass Safety Warden review before generating construction documents.
**Key constraint:** All construction documents require review by a licensed Professional Engineer before use in procurement, construction, or installation.
> **ENGINEERING DISCLAIMER:** All construction documents generated by this skill are AI-assisted drafts. They MUST be reviewed, stamped, and signed by a licensed Professional Engineer (PE) before use in procurement, construction, installation, or commissioning. Local building codes, jurisdictional requirements, and site-specific conditions may impose additional requirements not captured here. User assumes all responsibility for PE review and code compliance.
**Quick start:** Provide a completed BlueprintPackage (from the blueprint engine) and this skill generates all four document types. Templates are available in `@references/templates/` for customization.
```
Input: BlueprintPackage (drawings + calculations + BOM + safetyReview)
Output: BOM spreadsheet, installation sequence, commissioning checklists, O&M manual
```
**Quick routing:**
- BOM generation? See [BOM Generation](#bom-generation-constr-01)
- Installation ordering? See [Installation Sequence](#installation-sequence-constr-02)
- Test procedures? See [Pre-Commissioning Checklists](#pre-commissioning-checklists-constr-03)
- System startup? See [Commissioning Procedures](#commissioning-procedures-constr-04)
- Maintenance docs? See [O&M Manual Generation](#om-manual-generation-constr-05)
---
## BOM Generation (CONSTR-01)在 GitHub 阅读完整来源 (打开外部页面)