Skill-Details

construction-docs

Creates construction documentation packages, commissioning checklists, and O&M manuals.

ÜbereinstimmungDirektGeprüft für bauwesen
Quelletibsfox/gsd-skill-creatorExterne Quelle
Gemeldete Installationen2Nur Popularitätssignal

Vor Nutzung prüfen

Die automatische Prüfung bewertet Relevanz, nicht Sicherheit oder Empfehlung. Lies vor der Nutzung die Quellanweisungen.

Gespeicherte Quellvorschau

SKILL.md

Dieser Auszug wurde bei der Prüfung gespeichert. Die externe Quelle enthält die vollständige und aktuelle Version.

---
name: construction-docs
version: 1.0.0
description: "Generates complete construction documentation packages — BOM, installation sequences, commissioning checklists, and O&M manuals — from verified engineering designs."
user-invocable: true
allowed-tools: Read Grep Glob Bash
metadata:
  extensions:
    gsd-skill-creator:
      version: 1
      createdAt: "2026-02-27"
      triggers:
        intents:
          - "bill of materials"
          - "BOM"
          - "installation sequence"
          - "commissioning"
          - "pre-commissioning"
          - "O&M manual"
          - "operations and maintenance"
          - "construction documents"
          - "hydrostatic test"
          - "megger test"
          - "insulation resistance"
          - "punch list"
          - "startup procedure"
          - "spare parts"
          - "maintenance schedule"
        contexts:
          - "construction documentation"
          - "infrastructure engineering"
          - "commissioning procedures"
          - "data center construction"
domain: physical-infrastructure
tier: output
depends_on:
  - fluid-systems
  - power-systems
  - thermal-engineering
  - blueprint-engine
safety: mandatory-pe-disclaimer
applies_to:
  - skills/physical-infrastructure/**
  - "*.calc"
  - "*.pid"
  - "*.sld"
---

# Construction Documents Skill

## At a Glance

Generate the complete paper package that contractors need to build a system — Bill of Materials, installation sequences, commissioning tests, and Operations & Maintenance manuals — from verified engineering designs.

**Activation:** After the Architect, Calculator, and Safety agents complete a design and the blueprint engine has generated drawings. InfrastructureRequest with outputFormat including 'construction'.

**Four output types:**

1. **Bill of Materials (BOM):** Structured material list with quantities, part numbers, and suppliers extracted from verified design calculations.
2. **Installation Sequence:** Code-driven ordering of construction activities with trade assignments, prerequisites, and inspection hold points.
3. **Commissioning Checklists:** Pre-commissioning test procedures (hydrostatic, megger) and system startup procedures with acceptance criteria.
4. **O&M Manual:** Maintenance schedules, spare parts lists, operating procedures, and emergency procedures for the completed system.

**When to use:** Design is verified and safety-reviewed, ready for construction. All calculations must pass Safety Warden review before generating construction documents.

**Key constraint:** All construction documents require review by a licensed Professional Engineer before use in procurement, construction, or installation.

> **ENGINEERING DISCLAIMER:** All construction documents generated by this skill are AI-assisted drafts. They MUST be reviewed, stamped, and signed by a licensed Professional Engineer (PE) before use in procurement, construction, installation, or commissioning. Local building codes, jurisdictional requirements, and site-specific conditions may impose additional requirements not captured here. User assumes all responsibility for PE review and code compliance.

**Quick start:** Provide a completed BlueprintPackage (from the blueprint engine) and this skill generates all four document types. Templates are available in `@references/templates/` for customization.

```
Input:  BlueprintPackage (drawings + calculations + BOM + safetyReview)
Output: BOM spreadsheet, installation sequence, commissioning checklists, O&M manual
```

**Quick routing:**
- BOM generation? See [BOM Generation](#bom-generation-constr-01)
- Installation ordering? See [Installation Sequence](#installation-sequence-constr-02)
- Test procedures? See [Pre-Commissioning Checklists](#pre-commissioning-checklists-constr-03)
- System startup? See [Commissioning Procedures](#commissioning-procedures-constr-04)
- Maintenance docs? See [O&M Manual Generation](#om-manual-generation-constr-05)

---

## BOM Generation (CONSTR-01)
Vollständige Quelle auf GitHub lesen (öffnet externe Seite)
Kontext

Verwandte Arbeit